File #: 2023-073    Version: 1 Name:
Type: Consent Status: Passed
File created: 1/5/2023 In control: City Council
On agenda: 1/9/2023 Final action: 1/9/2023
Title: Approve Amendment #1 to Contract #20220045 for the Construction of the Floresta Drive Improvement Project Phase II.
Attachments: 1. 20220045-06 -A1 Amendment #1, 2. 20220045-05

Placement: Consent Agenda                     

Action Requested: Motion / Vote                     

title

Approve Amendment #1 to Contract #20220045 for the Construction of the Floresta Drive Improvement Project Phase II. 

body

 Submitted By: Robyn Holder, CPPB, Procurement Management Department (PMD).

 

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

 

Summary Brief (Agreements/Contracts only)

1.                     Prepared by: Robyn Holder, CPPB (PMD).

2.                     Parties: City of Port St. Lucie and Felix Associates of Florida, Inc.

3.                     Purpose: To incorporate redesign of the bridge piles/substructure to facilitate single-phase bridge construction within six (6) months.

4.                     New/Renewal/Modified: Modified.

5.                     Duration: No additional calendar days are required.

6.                     Benefits to Port St. Lucie: To insure bridge construction in a timely manner.

7.                     Cost to Port St. Lucie (Annual and Potential): Net deduction of ($240,726.00) for a new contract amount of $29,756,448.23.

 

Presentation Information: N/A.

 

Staff Recommendation: Move that the Council approve Amendment #1 to Contract #20220045 for the Construction of the Floresta Drive Improvement Project Phase II with Felix Associates of Florida, Inc.

 

Alternate Recommendations:

1.                     Move that the Council amend the recommendation and approve Amendment #1 to Contract #20220045.

2.                     Move that the Council nor approve Amendment #1 to Contract #20220045 and provide staff with direction.

 

Background: On 7/25, 2022, City Council approved Contract #20220045 for Floresta Drive Improvements Project Phase II in the amount of $29,997,174.23. Improvements to the Floresta Drive corridor is a priority of the City Council. The improvements include both a two-lane section with landscaped medians and a two-lane section with a bi-directional turn lane. Both sections include sidewalks, bike lanes, curb and gutter, landscaping, irrigation, water and sewer adjustments and pedestrian lighting. This phase also includes a bridge replacement and removal of an existing pedestrian bridge.  The proposed design will reduce vibrations to surrounding infrastructure. Single phase construction will improve overall quality of the bridge by eliminating construction joints and the need for temporary critical walls.

 

Issues/Analysis: Amendment is requested to adjust the contract value to incorporate cost savings associated with Contractor re-design of the bridge piles/substructure to facilitate single-phase bridge construction as well as a full closure of Floresta Drive between Thanksgiving Avenue and Thornhill Drive for a period of 201 calendar days, as outlined herein.

                     

Financial Information: Funds are appropriated in the Half Cent Sales Tax Funs / Road & Bridge / Improvements O/T Building (#310-4105-563000-00000).

 

Special Consideration: N/A.

 

Location of Project: Floresta Drive between Thanksgiving Avenue & Thornhill Drive.

 

Attachments:

1. Amendment #1.

2. Original Contract.

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 9252

 

Legal Sufficiency Review: 