Placement: Resolutions
Action Requested: Motion / Vote
title
Resolution 25-R19, Authorizing The Final Acceptance of Public Roadway Improvements for SW Tradition Parkway Phases 1 & 2 (P20-143), SW Tradition Parkway Phase 3 (P21-171) and SW Fernlake Drive (P20-196), Constructed by Mattamy Palm Beach, LLC.
body
Submitted By: Clyde Cuffy, P.E., Public Works
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Executive Summary (General Business): Mattamy Palm Beach, LLC has completed the construction of the four lane divided roadway of SW Tradition Parkway Phases 1, 2 & 3 and the two lane roadway of SW Fernlake Drive as approved by City Council. The developer has requested the City accept ownership and maintenance of the roadway improvements in accordance with City Code of Ordinance Section 156.150.
Presentation Information: Staff will be available to answer questions.
Staff Recommendation: Move that the Council accept the roadway improvements in accordance with Section 156.150 of the City Code of Ordinances.
Alternate Recommendations:
1. Move that the Council amend the recommendation and accept the roadway improvements.
2. Move that the Council not accept the roadway improvements and provide staff direction.
Background: Mattamy Palm Beach, LLC (Developer) has completed the construction of SW Tradition Parkway Phases 1, 2 & 3, and SW Fernlake Drive. The roadway plans were approved by City Council by Resolutions 21-R75, 22-R14 and 22-R79. The approved roadway plans detail the construction of the four (4) lane SW Tradition Parkway and two (2) lane SW Fernlake Drive together with landscaping, sidewalk, and drainage improvements that will support the roadway. SW Tradition Parkway extends the roadway 6,600 linear feet from the Renaissance Charter School’s driveway to approximately 100 feet west of the Cadence and Seville round-a-bout. SW Fernlake Drive is approximately 1,115 linear feet of roadway from the Tradition Parkway round-a-bout to approximately 177 feet north of the Emry’s emergency entrance. The total construction cost incurred by the developer for the project was $14,176,799.91. The Developer has provided the project cost estimate, maintenance bond, warranty, Bill of Sale and Owner’s Affidavit for the improvements constructed within the road right-of-way for the respective project. The Public Works and Utilities Systems Departments inspected the public infrastructure as it was being constructed within the road right-of-way of SW Tradition Parkway and SW Fernlake Drive in addition to performing a substantial completion and final acceptance review in accordance with the Florida Statues and City Code. The Engineer of Record has certified the improvements of SW Tradition Parkway Phases 1, 2 & 3 and SW Fernlake Drive to be turned over to the City, have been constructed in accordance with the approved plans and per the City’s specifications. The Landscape Architect has certified that the landscape improvements of SW Tradition Parkway 1, 2 & 3 and SW Fernlake Drive have been constructed in accordance with the approved plans and per the City’s specifications. Representatives of the Public Works Department generated a punch list on November 28, 2023. A final inspection was performed on August 6, 2024, to confirm all punch list items were satisfied. Upon review of the information provided by the developer, roadway engineer of record and landscape architect, the Public Works Department recommends that the roadway and landscape improvements constructed by Mattamy Palm Beach, LLC. be accepted to be in accordance with City Code.
The City Attorney’s Office has reviewed the Bill of Sale and Owner’s Affidavit for these public improvements in accordance with City Code.
Issues/Analysis: City Council’s execution of this Resolution will formally accept ownership and maintenance responsibility of the completed roadway improvements. The ownership and maintenance responsibility of the completed landscape improvements will be the City’s unless and until the developer enters into a Landscaping Maintenance Agreement that states otherwise with the City.
Financial Information: Roadway pavement typically has a service life of 15 to 20 years; therefore, maintenance costs are anticipated to be minimal for the initial service life. The maintenance costs associated with turf and landscaping of the 7,715 LF of roadway is estimated to be $0,000 annually.
Special Consideration: In accordance with City Code 156.148 (E), the City Council shall either approve, partially approve, or reject the improvements based on the recommendation from the City Engineer. The City must notify the developer in writing, by certified mail, not later than forty-five (45) days after receipt of the notice from the developer if the City intends to accept or not accept responsibility of the improvements. Failure of the governing body to send or provide such notification to the developer within forty-five (45) days shall be deemed to constitute approval of the improvements, and the obligor and surety, if any, shall be released from all liability pursuant to such performance guarantee for such improvements. Based on the receipt date of March 14, 2025, a notice needs to be sent to the developer by no later than April 28, 2025.
Location of Project: SW Tradition Parkway from the Renaissance Charter School’s driveway to the Cadence and Seville round-a-bout together with SW Fernlake Drive from Tradition Parkway to approximately 177 feet north of the Emry’s emergency entrance.
Business Impact Statement: N/A
Attachments:
1. Resolution
2. Owner’s affidavits for SW Tradition Parkway and SW Fernlake Drive
3. Bill of Sale Absolute for SW Tradition Parkway and SW Fernlake Drive
4. Warranty Records for SW Tradition Parkway and SW Fernlake Drive
5. Cost Estimate for SW Tradition Parkway and SW Fernlake Drive
6. Maintenance Bond for SW Tradition Parkway and SW Fernlake Drive
7. Irrigation Certification
8. Roadway Turnover Request letter for SW Tradition Parkway and SW Fernlake Drive
9. Landscape Certification
10. Engineer’s Certification of Completion
11. Recorded Plat of SW Tradition Parkway and SW Fernlake Drive
12. Location Map
13. Public Works Substantial Completion Inspections Memo
14. Public Works Roadway Turnover Recommendation Memo
NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.
Internal Reference Number: 25091-11
Legal Sufficiency Review:
Reviewed by Elizabeth L. Hertz, Senior Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, City Attorney.