Placement: Consent Agenda
Action Requested: Motion / Vote
title
Award Contract #20260293 for the Construction of Tradition Pkwy and Village Pkwy Intersection Improvements.
body
Submitted By: Alaina Knofla, Procurement Manager, Procurement Management Division (PMD).
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Alaina Knofla, Procurement Manager (PMD).
2. Parties: City of Port St. Lucie and R & D Paving, LLC.
3. Purpose: To construct the Tradition Pkwy and Village Pkwy Intersection Improvements
4. New/Renewal/Modified: New.
5. Duration: Nine (9) months.
6. Benefits to Port St. Lucie: The Tradition Pkwy and Village Pkwy Improvements Project will help ease peak-time congestion, support future growth, and improve the safety of motorists and pedestrians traveling through the area.
7. Cost to Port St. Lucie (Annual and Potential): A one-time expense in the amount $1,701,710.66.
Presentation Information: N/A.
Staff Recommendation: Move that the Council award Contract #20260293 and enter into a unit price contract with R & D Paving, LLC. for the Construction of Tradition Pkwy and Village Pkwy Intersection Improvements.
Alternate Recommendations:
1. Move that the Council amend the recommendation and approve the recommended bid.
2. Move that the Council reject all bids and provide staff with direction to rebid or cancel the bid.
Background: The City of Port St. Lucie (City) requires Construction Services for the construction of roadway improvements at the intersection of Tradition Parkway and Village Parkway within the City of Port St. Lucie. The roadway improvements are described in the project plan set prepared by DRMP, Inc. (Design Professional of Record) entitled “City of Port St. Lucie Contract Plans Tradition & Village Pkwy.” The project includes roadway, intersection, and multimodal enhancements necessary to support the final lane configurations, operational improvements, and safety features shown in the approved design plans. Work generally consists of pavement resurfacing and widening, installation of curb and gutter, concrete separators, sidewalk and pedestrian facility reconstruction, transit-related improvements, driveway adjustments, drainage modifications, grading, and other associated civil construction tasks required to implement the planned intersection geometry. The project also incorporates features to improve pedestrian and bicyclist safety, including reconstructed crosswalks, curb ramps, and other elements consistent with protected-intersection concepts presented in the design including public feedback. Additional work includes temporary traffic control, stormwater management measures, permitting activities, signing and pavement marking improvements, and roadway lighting adjustments to accommodate the new configuration and resolve conflicts with existing equipment. Signal-related work will include installation of conduit, pull boxes, and other infrastructure required to support the traffic signal improvements, along with coordination with the City’s signal contractor regarding locations, phasing, and scheduling of signalization components.
An IFB was issued on September 9, 2026, to 2,210 potential suppliers. There were 50 project followers with 8 bids being received on October 9, 2026. All bids were deemed responsive.
Issues/Analysis: Staff has reviewed the bids and finds that R & D Paving, LLC provides the lowest responsive and responsible bid.
Financial Information: Funds are appropriated in the Road & Bridge CIP Fund / Traffic / Improvements O/T Buildings (#304-4121-563000-0000).
Special Consideration: N/A.
Location of Project: Tradition Pkwy and Village Pkwy Intersection.
Attachments:
1. Notice of Intent to Award.
2. E-bid Tabulation Report.
3. Signed Contract #20260293.
4. Bid Documents.
NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.
Internal Reference Number: 26246-02.
Legal Sufficiency Review:
Reviewed by Alyssa Lunin, Senior Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, City Attorney.