File #: 2023-212    Version: 1 Name:
Type: Resolution Status: Passed
File created: 2/13/2023 In control: City Council
On agenda: 2/27/2023 Final action: 2/27/2023
Title: Resolution 23-R22, Authorizing the Final Acceptance of Public Roadway Improvements for SW Community Boulevard at Riverland Parcel A Phase 2 (P19-193), Constructed by Riverland Development Company, LLC
Attachments: 1. Resolution, 2. Owners Affidavit - Executed, 3. Bill of Sale - Executed, 4. Cost Estimate for Community Boulevard at Riverland Parcel A, 5. Maintenance Bond Rider, 6. Roadway Turnover Letter Request - Revised, 7. Landscape Arch Certification Letter, 8. Recorded Plat, 9. Location Map

Placement: Resolutions                     

Action Requested: Motion / Vote                     

title

Resolution 23-R22, Authorizing the Final Acceptance of Public Roadway Improvements for SW Community Boulevard at Riverland Parcel A Phase 2 (P19-193), Constructed by Riverland Development Company, LLC 

body

Submitted By: Melissa Perry, Project Coordinator, Public Works

 

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

 

Executive Summary (General Business): Riverland Development Company, LLC has completed the construction of the initial two lanes of SW Community Boulevard at Riverland Parcel A - Phase 2 (P19-193) as approved by City Council. The developer has requested the City accept ownership and maintenance of the roadway improvements in accordance with City Code of Ordinance Section 156.150.

 

Presentation Information: Staff will be available to answer questions.

 

Staff Recommendation: Move that the Council accept the roadway improvements in accordance with Section 156.150 of the City Code of Ordinances.

 

Alternate Recommendations:

1.                     Move that the Council amend the recommendation and accept the roadway improvements.

2.                     Move that the Council not accept the roadway improvements and provide staff direction

 

Background: Riverland Development Company, LLC (Developer) has completed the construction of SW Community Boulevard at Riverland Parcel A - Phase 2. The roadway plans were approved by City Council on January 27, 2020, by Resolution 20-R15. The approved roadway plans detail the construction of the initial two lanes together with landscaping, sidewalk, and drainage improvements that will support the ultimate roadway design. SW Community Blvd. extends the roadway 865 linear feet south of Riverland Parcel A main entrance to approximately 40 linear feet south of Riverland Paseo Park main entrance. The total construction cost incurred by the developer for the project was $581,832.50. The Developer has provided the project cost estimate, maintenance bond, Bill of Sale and Owner’s Affidavit for the improvements constructed within the road right-of-way for the respective project.   The Public Works and Utilities Systems Departments inspected the public infrastructure as it was being constructed within the road right-of-way of SW Community Blvd at Riverland Parcel A - Phase 2 in addition to performing a substantial completion and final acceptance review in accordance with the Florida Statues and City Code.   The Engineer of Record has certified the improvements of SW Community Boulevard at Riverland Parcel A - Phase 2 to be turned over to the City have been constructed in accordance with the approved plans and per the City’s specifications.  The Landscape Architect has certified that the landscape improvements of SW Community Blvd at Riverland Parcel A - Phase 2 have been constructed in accordance with the approved plans and per the City’s specifications.  Representatives of the Public Works Department generated a punch list on August 2, 2022, for the SW Community Blvd at Parcel A - Phase 2 project (P19-193).  A final inspection was performed on December 21, 2022, to confirm all punch list items were satisfied. Upon review of the information provided by the developer, roadway engineer of record and landscape architect, the Public Works Department recommends that the roadway and landscape improvements constructed by Riverland Development Company, LLC. be accepted to be in accordance with City Code.

The City Attorney’s Office has reviewed the Bill of Sale and Owner’s Affidavit for these public improvements in accordance with City Code

 

Issues/Analysis: City Council’s execution of this Resolution will formally accept ownership and maintenance responsibility of the completed roadway improvements. The ownership and maintenance responsibility of the completed landscape improvements will be the City’s unless and until the developer enters into a Landscaping Maintenance Agreement with the City.

                     

Financial Information: Roadway pavement typically has a service life of 15 to 20 years; therefore, maintenance costs are anticipated to be minimal for the initial service life. The maintenance costs associated with turf and landscaping of the 865 LF of roadways is estimated to be $7,000 annually.

 

Special Consideration: In accordance with City Code 156.148 (E), the City Council shall either approve, partially approve, or reject the improvements based on the recommendation from the City Engineer.  The City must notify the developer in writing, by certified mail, no later than forty-five (45) days after receipt of the notice from the developer if the City intends to accept or not accept responsibility of the improvements. Failure of the governing body to send or provide such notification to the developer within forty-five (45) days shall be deemed to constitute approval of the improvements, and the obligor and surety, if any, shall be released from all liability pursuant to such performance guarantee for such improvements. Based on the receipt date of January 19, 2023, a notice needs to be sent to the developer by no later than March 3, 2023.

 

Location of Project: SW Community Boulevard, just south of Riverland Parcel A main entrance to just south of the Riverland Arts and Culture Center and Riverland Paseo entrance.

 

Attachments:

1.                     Resolution

2.                     Owner’s affidavits for Community Boulevard at Riverland Parcel A

3.                     Bill of Sale Absolute for Community Boulevard at Riverland Parcel A

4.                     Cost Estimate for Community Boulevard at Riverland Parcel A

5.                     Maintenance Bond for Community Boulevard at Riverland Parcel A

6.                     Roadway Turnover Request letter for Community Boulevard at Riverland Parcel A

7.                     Community Blvd at Par-A Landscape Certification

8.                     Recorded Plat of Community Boulevard at Riverland Parcel A

9.                     Location Map

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 9450

 

Legal Sufficiency Review: 

Reviewed by Frank Moehrle, Deputy City Attorney. Approved as to Legal form and sufficiency by James D. Stokes, City Attorney.