City of Port St. Lucie header
File #: 2024-269    Version: 1 Name:
Type: Consent Status: Passed
File created: 3/7/2024 In control: City Council
On agenda: 3/25/2024 Final action: 3/25/2024
Title: Award Contract #20240047 for the Replacement of the Emergency Generator at Building B.
Attachments: 1. 20240047-174 Notice of Intent to Award- NOIA (Legistar Posting), 2. 20240047-08 E-Bid Tabulation Report, 3. 20240047-05 GLF Construction 3, 4. Recommended Proposal, 5. E-Bid Document, 6. Construction Plans

Placement: Consent Agenda                     

Action Requested: Motion / Vote                     

title

Award Contract #20240047 for the Replacement of the Emergency Generator at Building B.

body

 Submitted By: Robyn Holder, CPPB, Procurement Management Division (PMD).

 

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

 

Summary Brief (Agreements/Contracts only)

1.                     Prepared by: Robyn Holder, CPPB (PMD).

2.                     Parties: City of Port St. Lucie and GLF Construction Corporation.

3.                     Purpose: Replace the small generator at Building B to a larger generator to be able to provide power to the entire building during any outages.

4.                     New/Renewal/Modified: New.

5.                     Duration: One hundred eighty-eight (188) calendar days to provide a completion date of 9/30/2024 with no option to renew.

6.                     Benefits to Port St. Lucie: To ensure that back-up power is provided to Building B during a power outage.

7.                     Cost to Port St. Lucie (Annual and Potential): The one-time expenditure is $948,900.00.

 

Presentation Information: N/A.

 

Staff Recommendation: Move that the Council award Contract #20240047 and enter into a contract with GLF Construction Corporation for the replacement of the emergency generator at Building B.

 

Alternate Recommendations:

1.                     Move that the Council reject the recommended bid.

2.                     Move that the Council reject all bids and provide staff with direction.

 

Background: The existing generator at Building B needs to be replaced with a larger generator that will be able to run the entire building in the event of a power loss.

 

An E-Bid was issued on February 2, 2024, to 2,013 potential contractors. There were twenty-one (21) plan holders with two (2) responsive proposals and one (1) non-responsive proposal being received on March 5, 2024.

 

Issues/Analysis: Staff has reviewed the proposals and finds the GLF Construction Corporation provides the lowest responsive responsible bid. The project is partially funded by a State of Florida Division of Emergency Management Hazard Mitigation Grant which requires the bid be awarded to the lowest responsive responsible bidder. GLF Construction Corporation is not a local contractor.

                     

Financial Information: Funds are appropriated in the Capital CIP Fund / General Government / Improvements O/T Building (#301-1900-563000-00000).

 

Special Consideration: The State of Florida Division of Emergency Management Hazard Mitigation Grant provides partial funding in the amount of $986,458.75.

 

Location of Project:  City Hall Complex, Building B, 121 SW Port St. Lucie Blvd.

 

Attachments:

1.                     Notice of Intent to Award.

2.                     E-Bid Tabulation Report.

3.                     Signed Contract.

4.                     Recommended Proposal.

5.                     Bid Documents.

6.                     Construction Plans.

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 24031-03

 

Legal Sufficiency Review: 

Reviewed by Carly Fabien, Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, Interim City Attorney.