File #: 2025-583    Version: 1 Name:
Type: Consent Status: Consent
File created: 6/6/2025 In control: City Council
On agenda: 6/23/2025 Final action:
Title: Award Contract #20250062 for the Replacement & Automation of Four (4) Water Control Structures.
Attachments: 1. Notice of Intent to Award., 2. 20250062-08 E-Bid Tabulation Report, 3. Signed Contract., 4. Recommended Proposal., 5. Bid Documents with Addenda.

Placement: Consent Agenda                     

Action Requested: Motion / Vote                     

title

Award Contract #20250062 for the Replacement & Automation of Four (4) Water Control Structures.

body

 Submitted By: Robyn Holder, CPPB, Procurement Management Division (PMD).

 

Strategic Plan Link: The City's Goal of a high-performing city government organization.

 

Summary Brief (Agreements/Contracts only)

1.                     Prepared by: Robyn Holder, CPPB (PMD).

2.                     Parties: City of Port St. Lucie and Douglas N. Higgins, Inc.

3.                     Purpose: Replace critical stormwater infrastructure that has exceeded its service life.

4.                     New/Renewal/Modified: New.

5.                     Duration: 545 calendar days from Notice to Proceed.

6.                     Benefits to Port St. Lucie: Provides flood protection to the residents of Port St. Lucie and provides water quality to the St. Lucie River.

7.                     Cost to Port St. Lucie (Annual and Potential): One-time expenditure of $4,886,250.00.

 

Presentation Information: N/A.

 

Staff Recommendation: Move that the Council award Contract #20250062 and enter into a unit price contract with Douglas N. Higgins, Inc. for the Replacement & Automation of Four (4) Water Control Structures.

 

Alternate Recommendations:

1.                     Move that the Council amend and approve the recommended bid.

2.                     Move that the Council reject all bids and provide staff with direction to rebid or cancel the bid.

 

Background: These facilities were constructed as a flood protection measure almost 50 years ago and their service life has extended beyond repair, necessitating them to be removed and replaced with newly constructed hardware. This includes modernized technology to be remotely monitored and operated during and after emergency weather events.

 

An E-Bid was issued on March 27, 2025, to 954 potential suppliers. There were 44 plan holders with 2 proposals being received on April 29, 2025.

 

Issues/Analysis: Staff has reviewed the proposals and found that Douglas N. Higgins, Inc. provides the best value to the City.

                     

Financial Information: Funds are appropriated in the Stormwater Fund / Drainage / Improvements O/T Building / Water Control Structures A-14, A-16, A-17 & A-18 (#401-4126-563000-24PW025P, 25PW017P A-16, 17 & 18, #401-4126-563000-23PW019P).

 

Special Consideration: N/A.

 

Location of Project: Various locations.

 

Attachments:

1.                     Notice of Intent of Award.

2.                     E-Bid Tabulation Report.

3.                     Signed Contract.

4.                     Recommended Proposal.

5.                     Bid Documents with Addenda.

 

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 25042-01.

 

Legal Sufficiency Review: 

Reviewed by Alyssa Lunin, Senior Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, City Attorney.