Placement: Consent Agenda
Action Requested: Motion / Vote
title
Approve Amendment #5 to Contract 20210042 for Mowing of Major Thoroughfares & Sidewalk Edging.
body
Submitted By: A’lexis Curry-Hibbert, Procurement Contracting officer II, Procurement Management Division (PMD).
Strategic Plan Link: The City's Goal of safe, clean, and beautiful.
Summary Brief (Agreements/Contracts only)
1. Prepared by: A’lexis Curry-Hibbert, Procurement Contracting officer II, PMD.
2. Parties: City of Port St. Lucie and Sunshine Land Design, Inc.
3. Purpose: To provide perpetual mowing, litter control and sidewalk edging maintenance to our primary swale roadway network.
4. New/Renewal/Modified: Modified.
5. Duration: Initial term was three years with two additional two-year renewal options. Amendment #5 exercises the second and last renewal option to renew the Contract through July 31, 2028.
6. Benefits to Port St. Lucie: To provide a consistent level of services to manage weed growth, litter control and sidewalk edging along the City’s most traveled roadways.
7. Cost to Port St. Lucie (Annual and Potential): $560,966.00 estimated annually, plus a one-time initial cleaning fee of $5,000.00.
Presentation Information: N/A.
Staff Recommendation: Move that the Council approve Amendment #5 to Contract 20210042 for Mowing of Major Thoroughfares & Sidewalk Edging.
Alternate Recommendations:
1. Move that the Council amend the recommendation and approve Amendment #5 to Contract 20210042 for Mowing of Major Thoroughfares & Sidewalk Edging.
2. Move that the Council not approve and provide staff with direction.
Background: Amendment #5 renews Contract 20210042 for an additional two-year term through July 31, 2028. The amendment updates pricing to reflect current market conditions, adds approximately 68,542 linear feet of sidewalk edging within the City's roadway network, includes a one-time initial cleaning fee for newly added sidewalk areas, and enhances litter collection reporting requirements. There was also an error in the estimated annual amount in Amendment #4, and therefore, Amendment #5 corrects that error, leading to a reduction in the amount previously contained in Amendment #4. The revised estimated annual contract amount is $560,966, plus a one-time initial cleaning fee of $5,000.
The maintenance of roadway swales, litter control, and sidewalk edging throughout the City’s roadway network continues to be an important service for the City’s strategic plan of keeping it safe, clean, and beautiful. These services help maintain the overall appearance and functionality of the roadway network. Regular mowing and vegetation management assist with stormwater conveyance, help reduce conditions that may attract vermin, and contribute to a clean appearance along the roadway network. In addition, ongoing litter removal and sidewalk edging enhance cleanliness and ensure that the roadway network remains well maintained for the City’s residents.
Issues/Analysis: Staff has reviewed Amendment #5and finds that it meets the operational needs of the City and complies with the City’s procurement requirements.
Financial Information: Funds are available in the Public Works/Stormwater/Greenbelt & Waterway Maintenance/Mowing - ROW, Major (Account #104-4127-534104).
Special Consideration: N/A.
Location of Project: Various City locations.
Attachments:
1. Amendment #5 signed.
2. Amendment #4.
3. Amendment #3.
4. Amendment #2.
5. Amendment #1.
6. Contract #20210042.
NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.
Internal Reference Number: 26211-05.
Legal Sufficiency Review:
Reviewed by Alyssa Lunin, Senior Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, City Attorney.