File #: 2023-047    Version: 1 Name:
Type: Consent Status: Passed
File created: 12/28/2022 In control: City Council
On agenda: 1/9/2023 Final action: 1/9/2023
Title: Approve Amendment #1 to Contract #20220040 for the Glades to Tradition Reuse Water Main Construction Project
Attachments: 1. 20220040 Attachment C - Location Map, 2. 20220040 Amendment 01 - Felix Signed 12.28.22, 3. 20220040-05 with Bonds & Insurance

Placement: Consent Agenda                     

Action Requested: Motion / Vote                     

title

Approve Amendment #1 to Contract #20220040 for the Glades to Tradition Reuse Water Main Construction Project

body

 Submitted By: Robyn Holder, CPPB, Procurement Management Department (PMD)

 

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

 

Summary Brief (Agreements/Contracts only)

1.                     Prepared by: Robyn Holder, CPPB (PMD)

2.                     Parties: City of Port St. Lucie and Felix Associates of Florida, Inc.

3.                     Purpose: Revise the scope of work to change the installation method.

4.                     New/Renewal/Modified: Modified.

5.                     Duration: Additional 45 calendar days for a new end date of 7/7/2023.

6.                     Benefits to Port St. Lucie: To lessen the impact to the residents and Tradition Parkway which was recently extended through the project site.

7.                     Cost to Port St. Lucie (Annual and Potential): Additional $464,002.30 for a new total contract amount of $5,458,938.30.

 

Presentation Information: N/A.

 

Staff Recommendation: Move that the Council approve Amendment #1 to Contract #20220040 for the Glades to Tradition Reuse Water Main Construction Project with Felix Associates of Florida, Inc.

 

Alternate Recommendations:

1.                     Move that the Council amend the recommendation and approve Amendment #1 to Contract #20220040.

2.                     Move that the Council not approve Amendment #1 to Contract #20220040 and provide staff with direction.

 

Background:  The City Council awarded Contract #20220040 to Felix Associates of Florida, Inc. on June 13, 2022. From the time the construction start date was established, Tradition Parkway was extended through the project site, requiring a modification to the Contract. By changing the installation method from the open-cut method to the horizontal directional drilling (HDD) method, the impacts to the residents and the newly constructed Tradition Parkway extension will be reduced. The revised scope of work will also include a new 36-inch force main that will be installed via HDD beneath Tradition Parkway.

 

Issues/Analysis: Staff has reviewed the proposed changes described herein and finds it to be fair and reasonable.

                     

Financial Information: Funds are appropriated in the Utility CIP Fund / Preventative Maintenance / Improvements O/T Building (#448-3516-563000-00000).

 

Special Consideration: N/A.

 

Location of Project: Glades to Tradition Parkway.

 

Attachments:

1. Location Map.

2. Amendment #1 - signed.

3. Original Contract.

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 9467.

 

Legal Sufficiency Review: 

Reviewed by Ella M. Gilbert, Senior Deputy City Attorney. Approved as to Legal form and sufficiency by James D. Stokes, City Attorney.