File #: 2025-704    Version: 1 Name:
Type: Resolution Status: Agenda Ready
File created: 7/16/2025 In control: City Council
On agenda: 8/11/2025 Final action:
Title: Resolution 25-R45, a Resolution Allowing the Execution of an Interlocal Agreement with St. Lucie County, to Provide Funds for the Construction of Roadway Improvements on Prima Vista Blvd. as Part of the Floresta Dr. Phase 3 Project.
Attachments: 1. Resolution.pdf, 2. SLC Signed Interlocal - Prima Vista from NE Estia Lane to NE Naranja Avenue

Placement: Resolutions                     

Action Requested: Motion / Vote                     

title

Resolution 25-R45, a Resolution Allowing the Execution of an Interlocal Agreement with St. Lucie County, to Provide Funds for the Construction of Roadway Improvements on Prima Vista Blvd. as Part of the Floresta Dr. Phase 3 Project.

body

 Submitted By: Thomas Salvador, CPII, CPWP-S, CPWP-M, CIP & Sales Tax Project Group Manager,Public Works Department

 

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

 

Summary Brief (Agreements/Contracts only)

1.                     Prepared by: St. Lucie County

2.                     Parties: City of Port St. Lucie and St. Lucie County

3.                     Purpose: To provide funds for the construction of improvements to Prima Vista Blvd. as part of the Floresta Drive Phase 3 project.

4.                     New/Renewal/Modified: New

5.                     Duration: Project current end date is December 16, 2027

6.                     Benefits to Port St. Lucie: Improved traffic safety and congestion management to a portion of the Prima Vista Corridor

7.                     Cost to Port St. Lucie (Annual and Potential): No costs to be incurred by the City

 

Presentation Information: Staff will be available to answer questions upon request

 

Staff Recommendation: Move that the Council approve the Resolution authorizing the City to enter into the Interlocal Agreement.

 

Alternate Recommendations:

1.                     Move that the Council amend the recommendation and approve the Interlocal Agreement.

2.                     Move that the Council not approve the Interlocal Agreement and provide direction to staff.

 

Background: St. Lucie County and the City originally entered into an agreement to fund the design of the improvements to Prima Vista Blvd. as part of the Floresta Drive project. Following the completion of design, the Floresta Drive Phase 3 project was advertised for bids with both a Contractor and CEI selected for construction. As part of the project, the previously designed portion of County roadway was included in the solicitation and the County agreed to fund the construction of the Prima Vista Improvements.

 

Issues/Analysis: The partnership between the City and County is mutually beneficial by allowing a single contractor to construct the improvements and allow the harmonization with the adjacent project.

                     

Financial Information: The County agrees to reimburse the City for all costs of the construction of the proposed county improvements included in the CEI Contract and Construction Contract, including but not limited to construction engineering & inspection and geotechnical engineering services and all associated costs.

 

Special Consideration: N/A

 

Location of Project: Floresta Drive Phase 3, specifically within the right-of-way of Prima Vista Blvd.

 

Attachments:

1.                     Resolution

2.                     Interlocal Agreement

 

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 25099-05

 

Legal Sufficiency Review: 

Reviewed by Elizabeth L. Hertz, Senior Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, City Attorney.