File #: 2025-128    Version: 1 Name:
Type: Consent Status: Passed
File created: 1/28/2025 In control: City Council
On agenda: 2/10/2025 Final action: 2/10/2025
Title: Award Contract #20250045 for Utility Adjustments on Port St. Lucie Blvd from Darwin Blvd to Alcantarra Blvd.
Attachments: 1. 20250045-05 signed

Placement: Consent Agenda                     

Action Requested: Motion / Vote                     

title

Award Contract #20250045 for Utility Adjustments on Port St. Lucie Blvd from Darwin Blvd to Alcantarra Blvd.

body

 Submitted By: Robyn Holder, CPPB, Procurement Management Division (PMD).

 

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

 

Summary Brief (Agreements/Contracts only)

1.                     Prepared by: Robyn Holder, CPPB (PMD).

2.                     Parties: City of Port St. Lucie and Zahlene Enterprises, Inc. (ZEI).

3.                     Purpose: Adjustments are necessary to accommodate the reconstruction of Port St. Lucie Blvd. between Alcantarra Blvd. & Darwin Blvd. These adjustments include a 16-in Water Main & 16-in Force Main and various low-pressure mains.

4.                     New/Renewal/Modified: New.

5.                     Duration: 90 calendar days from Notice to Proceed (NTP).

6.                     Benefits to Port St. Lucie: The reconstruction and adjusted utilities will provide additional lanes of traffic, improve drainage conditions and provide areas with renewed water & sewer lines, newer valves, hydrants, and air release valves.

7.                     Cost to Port St. Lucie (Annual and Potential): One-time expense of $679,338.94.

 

Presentation Information: N/A.

 

Staff Recommendation: Move that the Council award Contract #20250045, per City Code of Ordinances, Section 35.08(a)(21) and Section 35.08(a)(24)(a)(5), and enter into a unit price contract with Zahlene Enterprises, Inc. for the Utility Adjustments needed on the Port St. Lucie Blvd. Reconstruction Project that is governed by the Florida Department of Transportation (FDOT).

 

Alternate Recommendations:

1.                     Move that the Council amend the recommendation and award Contract #20250045.

2.                     Move that the Council not approve Contract #20250045 and provide staff with direction.

 

Background: The purpose of this award is to procure the services of the existing contractor with the goal of making additional adjustments to the Utility Systems Department’s infrastructure.

 

The Florida Department of Transportation (FDOT) designed and is implementing the addition of traffic lanes, with the necessary drainage system along Port St. Lucie Blvd. between Darwin Blvd. and Alcantarra Blvd. Because this roadway belongs to and is managed by FDOT, any conflict with the FDOT’s infrastructure triggers adjustments to the water and sewer infrastructure of the City’s utility system. In coordination with FDOT, the Utility Systems Department planned and designed adjustments to the existing water and sewer lines with the goal of mitigating the unanticipated conflicts. The specific cases mentioned as part of this award resulted in unforeseen and differing field conditions during construction, differing from available records at the times of planning and design.

 

By issuing a separate contract with the existing construction company, the City will be able to keep the cost of the necessary adjustments as low as possible, avoiding two customarily required administrative fees. If completed by the FDOT’s Utility Contractor, the City would incur an additional up-front 10% contingency to FDOT as well as a 2.5% contribution to FDOT’s management costs.

 

Issues/Analysis: Section 35.08(a)(21), excepts from formal bidding the “[p]urchase of goods or services related to a project which has or will be awarded based on formal solicitation.” Additionally, Section 35.08(a)(24)(a)(5) provides an exception from formal bidding as a sole source where “additional supplies or services are needed to complete an existing and ongoing scope of work, even when the supplies or services were not contemplated at the onset of the project.” Staff has reviewed the proposal and found that Zahlene Enterprises, Inc. provides the best value to the City and is the current contractor for this project.

                     

Financial Information: Funds are appropriated in the Utility CIP Fund / Water Preventative Maint. / Improvements O/T Building (448-3316-563000-00000) & Utility CIP Fund / Sewer Preventative Maint. / Improvements O/T Building (448-3516-563000-00000).

 

Special Consideration: N/A.

 

Location of Project: Port St. Lucie Blvd between Darwin Blvd. & Alcantarra Blvd.

 

Attachments:

1.                     Signed Contract.

 

NOTE: All of the listed items in the “Attachment” section above are in the custody of the City Clerk. Any item(s) not provided in City Council packets are available upon request from the City Clerk.

 

Internal Reference Number: 25022-05

 

Legal Sufficiency Review: 

Reviewed by Alyssa Lunin, Deputy City Attorney. Approved as to Legal form and sufficiency by Richard Berrios, City Attorney.