Title: Award Contract #20260167 for the Green River Parkway Trail Construction Project Partially Funded by the Florida Department of Transportation (FDOT) Local Agency Program (LAP) Grant.
Attachments: 1. Notice of Intent to Award., 2. Bid Tabulation Report., 3. Signed Contract., 4. J.W. Cheatham, LLC Bid Submittal., 5. IFB #20260167 Bid Documents.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Placement: Consent Agenda
Action Requested: Motion / Vote
title
Award Contract #20260167 for the Green River Parkway Trail Construction Project Partially Funded by the Florida Department of Transportation (FDOT) Local Agency Program (LAP) Grant.
body
Submitted By: Robyn Holder, CPPB, Procurement Management Division (PMD).

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

Summary Brief (Agreements/Contracts only)
1. Prepared by: Robyn Holder, CPPB (PMD).
2. Parties: City of Port St. Lucie and J.W. Cheatham, LLC.
3. Purpose: The project aims to expand the City's network of connected sidewalk infrastructure.
4. New/Renewal/Modified: New.
5. Duration: 180 calendar days with no option to renew.
6. Benefits to Port St. Lucie: This project makes significant improvements to accessibility in accordance with the Americans with Disabilities Act (ADA). Proposed improvements consist of signage and striping, improvements to drainage and stormwater management system within and around the project limits.
7. Cost to Port St. Lucie (Annual and Potential): One-time expense of $908,000.00.

Presentation Information: N/A.

Staff Recommendation: Move that the Council award Contract #20260167 and enter into a unit price Contract with J.W. Cheatham, LLC for the Green River Parkway Trail Construction Project.

Alternate Recommendations:
1. Move that the Council amend and approve the recommended bid.
2. Move that the Council reject all bids and provide staff with direction to rebid or cancel the bid.

Background: Since 2006, the City has prioritized the design and construction of sidewalks citywide. The original areas were in proximity to schools and major roadways. Green River Parkway is on the 10-year Master Plan list approved by the City Council.

The City has received partial funding through the Florida Department of Transportation (FDOT) Local Agency Program (LAP) Grant to construct certain sidewalks.

An Invitation for Bid (IFB) was issue...

Click here for full text