Placement: Consent Agenda
Action Requested: Motion / Vote
title
Award Contract #20240111 for SW Kestor Drive Sidewalk Construction Project.
body
Submitted By: Robyn Holder, CPPB, Procurement Management Division (PMD).
Strategic Plan Link: The City's Goal of a high-performing city government organization.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Robyn Holder, CPPB (PMD).
2. Parties: City of Port St. Lucie and M&M Asphalt Maintenance, Inc. dba All County Paving.
3. Purpose: Add sidewalks throughout the City as per the 10-year Sidewalk Master Plan approved by Council.
4. New/Renewal/Modified: New.
5. Duration: 180 calendar days from the Notice to Proceed.
6. Benefits to Port St. Lucie: This project aims to expand the City's network of connected sidewalk infrastructure to help support pedestrian and non-motorized access throughout the City.
7. Cost to Port St. Lucie (Annual and Potential): One-time expense of $1,797,000.00.
Presentation Information: N/A.
Staff Recommendation: Move that the Council award Contract #20240111 and enter into a unit price contract with M&M Asphalt Maintenance, Inc. dba All County Paving for the SW Kestor Drive Sidewalk Construction Project.
Alternate Recommendations:
1. Move that the Council amend and approve the recommended bid.
2. Move that the Council reject all bids and provide staff with direction to rebid or cancel the bid.
Background: Since 2006, the City has prioritized the design and construction of sidewalks citywide. The original areas were in proximity to schools and major roadways. Kestor Drive is on the 10-year Sidewalk Master Plan list approved by the City Council.
The project includes, but is not limited to, the construction of approximately 7,287LF, or 1.38 miles of 6-foot-wide concrete sidewalk on the north and east side of SW Kestor Drive from SW Darwin Blvd. to SW Becker Road. This project also makes significant improvements to ADA accessibility, signage, striping, and the drainage & sto...