Placement: Consent Agenda
Action Requested: Motion / Vote
title
Award Contract #20210116 for the Construction of the Northport 24" Force Main on Glades Cutoff Road with Accurate Drilling System, Inc.
body
Submitted By: Shelby Dolan, Procurement Agent II, Procurement Management Department.
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Shelby Dolan, Procurement Management.
2. Parties: City of Port St. Lucie and Accurate Drilling System, Inc.
3. Purpose: To expand the force main to provide redundancy to the existing wastewater system.
4. New/Renewal/Modified: New.
5. Duration: 330 calendar days with no option to renew.
6. Benefits to Port St. Lucie: The expansion will relieve the pressure on the feeder lift stations located within adjacent neighborhoods due to the increased growth.
7. Cost to Port St. Lucie (Annual and Potential): One-time estimated expenditure of $3,622,820.
Presentation Information: N/A.
Staff Recommendation: Move that the Council award Contract #20210116 and enter into a unit price contract for the Construction of the Northport 24" Force Main on Glades Cutoff Road with Accurate Drilling System, Inc.
Alternate Recommendations:
1. Move that the Council amend the recommendation and award Contract #20210116.
2. Move that the Council not approve Contract #20210116 and provide staff with direction.
Background: The Northport 24" Force Main Project on Glades Cutoff Road in Port St. Lucie consists of a 24" force main that starts at Glades Cutoff Road south of Midway Road near Canal 105. From there it will proceed south to connect with an existing 24" force main on Glades Cutoff Road at the intersection of Commerce Centre Parkway. The project includes approximately 8,240 linear feet of 24" main, two 24" x 16" stub-outs for future connections, a 24" x 24" stub-out for a future connection, 24" line stops, 24" tapping sleeve and valve, 24...
Click here for full text