Title: Award Contract # 20210032 for the Construction Engineering and Inspection (CEI) and Geotechnical (GEO) Services for the Port St. Lucie Boulevard (Blvd.) North Project.
Attachments: 1. Vendor Executed Contract, 2. PSL Blvd-Segment Overview Map (w dates)_NEW
Placement: Consent Agenda
Action Requested: Motion / Vote
title
Award Contract # 20210032 for the Construction Engineering and Inspection (CEI) and Geotechnical (GEO) Services for the Port St. Lucie Boulevard (Blvd.) North Project.
body
Submitted By: Jason Bezak, CPPB, Procurement Agent II, Procurement Management Department (PMD).

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

Summary Brief (Agreements/Contracts only)
1. Prepared by: Jason Bezak, Procurement Management Department.
2. Parties: City of Port St. Lucie and Consor Engineers, LLC.
3. Purpose: Provide Construction Engineering and Inspection (CEI) and Geotechnical (GEO) Services for the Port St. Lucie Blvd. North Project, which will assist Staff in management of the construction.
4. New/Renewal/Modified: New.
5. Duration: The Contract Period is for 500 calendar days.
6. Benefits to Port St. Lucie: The PSL Boulevard North project will provide additional intersection capacity, accessible multi-use pathways, pedestrian lighting, underground drainage.
7. Cost to Port St. Lucie (Annual and Potential): The total amount to be paid by the City to the Consultant is on a time and materials basis per the fee schedule in the amount of $959,795.

Presentation Information: N/A.

Staff Recommendation: Move that the Council award Contract # 20210032 for the Construction Engineering and Inspection (CEI) and Geotechnical (GEO) Services for the Port St. Lucie Blvd. North Project.

Alternate Recommendations:
1. Move that the Council reject Contract # 20210032 and provide staff with direction.

Background: The limits of the project are approximately from SW Darwin Blvd. to SW Cairo Avenue. The existing 4-lane divided roadway utilizes an open swale drainage system. The proposed roadway section will be fully "urban" with curb and gutter, multi-use paths, landscaping, irrigation, and roadway and pedestrian lighting. It will match the section to be constructed by the Florida Depart...