Placement: Consent Agenda
Action Requested: Motion / Vote
title
Approve Amendment #1 to Contract #20220067 with Holtz Consulting Engineers, Inc. for Phase 2 of Progressive Design-Build to Connect Homes to City Sewer
body
Submitted By: Kevin R. Matyjaszek, Utility Systems Department Director
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Utility Systems Department ("USD")
2. Parties: City of Port St. Lucie and Holtz Consulting Engineers, Inc., a Florida corporation
3. Purpose: The USD offered the developer of Noble Oaks Estates the opportunity to connect up to 15 homes to the City's utility system. With the focus on water quality, and to avoid adding additional septic systems in such close proximity to the river, the USD would design and construct a lift station, connecting the low pressure main, force main and related appurtenances up to the point of service for each home.
4. New/Renewal/Modified: New
5. Duration: The estimated time for construction of the lift station is 270 days from the date the City issues a notice to proceed for Phase 2.
6. Benefits to Port St. Lucie: Constructing the lift station would further the goal to preserve water quality on the river. The lift station would immediately take waste flows from the newly constructed homes but would also be designed and built to accommodate additional flows from surrounding neighborhoods aging septic systems should the homeowners choose to convert to City sewer. Also, the lift station would be able to accommodate waste flows from the current and future development of the SE parcel at Midway/St. James.
7. Cost to Port St. Lucie (Annual and Potential): The estimated total cost for design (Phase 1) and construction (Phase 2) is $1,060,345.00.
Presentation Information: N/A
Staff Recommendation: Move that the Council approve Contract #20220067 Amendment #1 to construct a lift station for Noble Oaks Lan...