File #: 2021-086    Version: 1 Name:
Type: Resolution Status: Passed
File created: 1/19/2021 In control: City Council
On agenda: 2/8/2021 Final action: 2/8/2021
Title: Resolution 21-R12, Authorizing the City Manager, or his designee, to Enter into and Execute a Construction Agreement with the State of Florida Department of Transportation for the Purpose of Constructing Roadway Improvements within the Right-of-Way of State Road 716 (Port St. Lucie Boulevard).
Attachments: 1. 1.14.21_RESO, 2. Construction Agreement, 3. EXHIBIT A, 4. Project Location Map, 5. Floresta_FDOT Permit Plans_GR1 thru UTV 20200515, 6. Floresta_FDOT Permit Plans_Lighting_SS_20200625, 7. Floresta_FDOT Permit Plans_PNC_SS_20200619, 8. Floresta_FDOT Permit Plans_Roadway_SS_20200620, 9. Floresta_FDOT Permit Plans_Signals_Mast Arm Boring Soil Profiles_SS_20200506, 10. Floresta_FDOT Permit Plans_Signals_SS_20200824, 11. Floresta_FDOT Permit Plans_SPM_SS_20200620, 12. Floresta_FDOT Permit Plans_UtilityRelocation_SS_20200626
Placement: Resolutions
Action Requested: Motion / Vote
title
Resolution 21-R12, Authorizing the City Manager, or his designee, to Enter into and Execute a Construction Agreement with the State of Florida Department of Transportation for the Purpose of Constructing Roadway Improvements within the Right-of-Way of State Road 716 (Port St. Lucie Boulevard).
body
Submitted By: Frank Knott, Manager, Engineering

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

Executive Summary (General Business): The purpose of this Resolution is to enter into a Construction Agreement which allows for roadway improvements to be constructed within the Right-of-Way of State Road 716 (Port St. Lucie Boulevard) as part of the Floresta Corridor Improvement Project. The improvements include: the addition of an eastbound right-turn lane, the addition of a southbound right-turn lane, improvement of the existing westbound right turn lane and the installation of traffic signal mast arms to replace the span wire system at the intersection of State Road 716 (Port St. Lucie Boulevard) and Floresta Drive

Presentation Information: N/A

Staff Recommendation: Move that the Council approve the Resolution.

Alternate Recommendations:
1. Move that the Council amend the recommendation and approve the Resolution.
2. Move that the Council not approve the Resolution provide staff direction.

Background: Improvements to the Floresta Drive corridor are a priority for the City Council and at the 2017 Summer Retreat, Council directed staff to model the corridor from a traffic standpoint for both a 2-lane and 4-lane roadway section. The new modeling was performed, and it included the new Crosstown Parkway Extension Project connection to U.S. Highway 1 at Village Drive, for the projected traffic volumes in the year 2037. The results/recommendations were presented to City Council on October 30, 2017, for consideration. The City Council unanimously passed the motion fo...