City of Port St. Lucie header
File #: 2024-694    Version: 1 Name:
Type: Resolution Status: Passed
File created: 7/8/2024 In control: City Council
On agenda: 8/12/2024 Final action: 8/12/2024
Title: Resolution 24-R44, Approve Acceptance of Utility Easement from Oculus Surgical, Inc.
Attachments: 1. Resolution, 2. Exhibit "A" to Resolution - Utility Easement
Placement: Resolutions
Action Requested: Motion / Vote
title
Resolution 24-R44, Approve Acceptance of Utility Easement from Oculus Surgical, Inc.
body
Submitted By: Kevin R. Matyjaszek, Utility Systems Director

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

Summary Brief (Agreements/Contracts only)
1. Prepared by: Utility Systems Department ("USD")
2. Parties: City of Port St. Lucie Utility Systems Department and Oculus Surgical, Inc.
3. Purpose: Accept the conveyance of an easement from Oculus Surgical, Inc. to the City of Port St. Lucie for utility purposes.
4. New/Renewal/Modified: New.
5. Duration: N/A
6. Benefits to Port St. Lucie: If approved, the utility easement will be conveyed to the City for utility purposes, specifically, the replacement of a sanitary sewer main, manholes and related appurtenances.
7. Cost to Port St. Lucie (Annual and Potential): There is no cost to the City for this easement.

Presentation Information: N/A

Staff Recommendation: Move that the Council approve Resolution 24-R44 accepting a utility easement from Oculus Surgical, Inc.

Alternate Recommendations:
1. Move that the Council amend the recommendation and approve Resolution 24-R44 accepting a utility easement from Oculus Surgical, Inc.
2. Move that the Council not approve and provide the staff with direction.

Background: In 2021, as part of the temporary construction easement terms, Oculus Surgical, Inc was required to grant the City a permanent, non-exclusive utility easement over the premises described in the site plan for the installation, operation and continued maintenance of the City's utility facilities. This second easement covers an additional (new) 208 linear feet of gravity sewer main, a sewer manhole and 366 linear feet of 8" watermain extension that extends to a fire line connection near the building.

The first easement only covers up to the existing (SMH-4) connecting manhole.

Issues/Analysis: The term...