Award Contract #20250032 for Replacement of Lift Station NP-13 with Felix Civil Construction, LLC.
body
Submitted By: Oksana Savchenko, Procurement Analyst, Procurement Division.
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Oksana Savchenko, Procurement Analyst, PMD.
2. Parties: City of Port St. Lucie and Felix Civil Construction, LLC.
3. Purpose: Existing lift station NP-13 has reached the end of its serviceable life and requires replacement to meet current and future demands. This project scope is to install a new lift station and decommission the existing station.
4. New/Renewal/Modified: New.
5. Duration: 360 calendar days.
6. Benefits to Port St. Lucie: By replacing this existing lift station, the Utility Systems Department can better serve the increasing population, prevent sanitary sewer overflows, and reduce maintenance costs.
7. Cost to Port St. Lucie (Annual and Potential): The total contract cost is a one-time expense of $1,194,466.00.
Presentation Information: N/A.
Staff Recommendation: Move that the Council award Contract #20250032 for Replacement of Lift Station NP-13 to Felix Civil Construction, LLC.
Alternate Recommendations:
1. Move that the Council amend the recommendation and award Contract #20250032 for Replacement of Lift Station NP-13 with Felix Civil Construction, LLC.
2. Move that the Council reject all bids and provide staff with directions to reissue the solicitation or cancel the Invitation for Bid.
Background: The existing lift station (NP-13) has reached the end of its useful life. As the City continues to grow, older lift stations require upgrading, expansion, and/or replacement. The existing station has been experiencing increased flow, which over time it will eventually be unable to accommodate. In order to prevent sanitary sewer overflows, a new sta...