Skip to main content
City of Port St. Lucie header
File #: 2023-240    Version: 1 Name:
Type: Public Hearing - Quasi Judicial Status: Failed
File created: 2/21/2023 In control: Planning and Zoning Board
On agenda: 3/7/2023 Final action: 3/7/2023
Title: P22-269 Jared & Emily Greenberg - Variance Location: 702 SW Abode Avenue Legal Description: Port St. Lucie - Section 33, Block 2326, Lot 21 This is a request to grant a variance of 9.51 feet to allow a 0.49-foot setback from the rear property line for an existing 21.50-foot by 24-foot (516 sf2) covered playhouse.
Attachments: 1. Staff Report, 2. Survey, 3. Application, 4. Warranty Deed, 5. Site Photos, 6. Staff Presentation
Placement: Public Hearing - Quasi Judicial
Action Requested: Motion / Vote
title
P22-269 Jared & Emily Greenberg - Variance
Location: 702 SW Abode Avenue
Legal Description: Port St. Lucie - Section 33, Block 2326, Lot 21
This is a request to grant a variance of 9.51 feet to allow a 0.49-foot setback from the rear property line for an existing 21.50-foot by 24-foot (516 sf2) covered playhouse.
body
Submitted By: Bethany Grubbs, Planner III

Executive Summary: The applicant is requesting a variance of 9.51 feet to allow a 0.49 setback from the rear property line for an existing 21.50-foot by 24-foot (516 sf2) covered playhouse. Section 158.217(C)(1) of the City's Code of Ordinance states accessory uses or structures located within Single-Family Residential (RS-2) Zoning District shall have a minimum setback of ten (10) feet from the rear property line.

Presentation Information: Staff will provide a presentation.

Planning and Zoning Board Action Options:
* Motion to approve
* Motion to approve with conditions
* Motion to deny
* Motion to table or continue the hearing or review to a future meeting

Background: See the attached staff report.

Issues/Analysis: See the attached staff report.

Special Consideration:
1. If the variance is approved, the property owner will be required to have the 10' rear drainage and utility easement abandoned by the Public Works Department.
? Should the Board desire to approve the variance staff recommends conditioning the approval as follows:
The applicant shall obtain formal abandonment of the utility and drainage easement prior to obtaining a building permit, and within 120 days of the variance approval. If the applicant fails to comply with this condition the variance will be deemed null and void.
2. If the variance is approved, the property owner will be required to obtain a building permit for the structure.
? Failure of the applicant to obtain a building permit for the structure will cause the Code case to remain acti...

Click here for full text