City of Port St. Lucie header
File #: 2021-023    Version: 1 Name:
Type: Resolution Status: Passed
File created: 12/21/2020 In control: City Council
On agenda: 1/11/2021 Final action: 1/11/2021
Title: Resolution 21-R03, A Resolution of the City Council of the City Of Port St. Lucie, Florida, Authorizing the City Manager to Execute the State of Florida Department of Transportation Utility Work by Highway Contractor Agreement Necessary to Relocate the City's Utility Facilities for the Public Purpose of Constructing and Improving Port St. Lucie Boulevard From Paar Drive to Alcantarra Boulevard; Providing for Severability; Providing an Effective Date.
Attachments: 1. PSL Blvd South Resolution for Hwy Contractor Agreement 10.16.20 Phase 2 updated, 2. 431752-5 City of Port St Lucie UWHCA Phase 2 - Paar
Placement: Resolutions
Action Requested: Motion / Vote
title
Resolution 21-R03, A Resolution of the City Council of the City Of Port St. Lucie, Florida, Authorizing the City Manager to Execute the State of Florida Department of Transportation Utility Work by Highway Contractor Agreement Necessary to Relocate the City's Utility Facilities for the Public Purpose of Constructing and Improving Port St. Lucie Boulevard From Paar Drive to Alcantarra Boulevard; Providing for Severability; Providing an Effective Date.
body
Submitted By: Brad Macek, Utility Systems Director

Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.

Summary Brief (Agreements/Contracts only)
1. Prepared by: State of Florida Department of Transportation (FDOT)
2. Parties: City of Port St. Lucie (Utility Systems Department and Public Works) and the State of Florida Department of Transportation.
3. Purpose: FDOT road widening of Port St. Lucie Boulevard South- Utility Highway Contractor Agreement
4. New/Renewal/Modified: New
5. Duration: N/A
6. Benefits to Port St. Lucie: Expansion of Port St. Lucie Boulevard South
7. Cost to Port St. Lucie (Annual and Potential): Estimated cost of utility work for this phase is $1,839,464.10

Presentation Information: The FDOT is constructing, reconstructing, or otherwise changing a portion of a public road or publicly owned rail corridor, said project being identified as Port St. Lucie Blvd from South of Paar Drive to South of Alcantarra Boulevard and the City ("UAO") owns or desires to install certain utility facilities which are located within the limits of the Project. The Project requires the location (vertically and/or horizontally), protection, relocation, installation, adjustment or removal of the City's utility facilities, or some combination thereof. The FDOT and the UAO desire to enter into a joint agreement pursuant to Section 337.403(1)(b), Florida Statutes for the Utility Work to be accomplished by the FDOT's c...