Award Contract #20230061 for Design & Permitting for Hogpen Slough Stormwater Treatment Area.
body
Submitted By: Michelle Fentress, Procurement Contracting Officer II, Procurement Management Division (PMD).
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Michelle Fentress, Procurement Contracting Officer II, PMD.
2. Parties: City of Port St. Lucie, and WGI, Inc.
3. Purpose: To have the projected area cleaned along the existing slough banks, create a stormwater treatment area (STA), and replace a downstream weir.
4. New/Renewal/Modified: New.
5. Duration: The Contract term shall be for two hundred forty (240) calendar days with no renewal options.
6. Benefits to Port St. Lucie: The project will provide added stormwater quality treatment to benefit the St. Lucie River and adjacent communities and to help meet the goals of the St. Lucie River and Estuary Basin Management Action Plan (BMAP). The project will also provide an updated stormwater control structure with a Supervisory Control and Data Acquisition (SCADA) system that will be tied in with the overall City system which will enable real time rainfall and water stage information to be utilized to control the automated gates and reduce flooding impacts.
7. Cost to Port St. Lucie (Annual and Potential): The estimated expenditure for FY 2023/2024 is $225,653.00.
Presentation Information: N/A.
Staff Recommendation: Move that the Council award Contract #20230061 for Design & Permitting for Hogpen Slough Stormwater Treatment Area with WGI, Inc.
Alternate Recommendations:
1. Move that the Council not approve Contract #20230061 and provide staff with direction.
Background: The "Microbial Source Tracking of Bacterial Pollution in the North Fork of the St Lucie River Report" by Harbor Branch Oceanographic Institute at Florida Atlantic University dated...