Placement: Consent Agenda
Action Requested: Motion / Vote
title
Award Contract #20220040 for the Glades to Tradition Reuse Water Main Construction Project.
body
Submitted By: Robyn Holder, CPPB, Procurement Management Department (PMD).
Strategic Plan Link: The City's Goal of high-quality infrastructure and facilities.
Summary Brief (Agreements/Contracts only)
1. Prepared by: Robyn Holder, CPPB (PMD).
2. Parties: City of Port St. Lucie and Felix Associates of Florida, Inc.
3. Purpose: To install a 24-inch reuse water main pipe to connect to the existing reuse water main at Glades Cut Off Road.
4. New/Renewal/Modified: New.
5. Duration: 330 calendar days with no option to renew.
6. Benefits to Port St. Lucie: To expand the reuse system.
7. Cost to Port St. Lucie (Annual and Potential): One time expenditure of $4,994,936.00.
Presentation Information: N/A.
Staff Recommendation: Move that the Council award the Glades to Tradition Reuse Water Main Construction Project to Felix Associates of Florida, Inc. in the amount of $4,994,936.00.
Alternate Recommendations:
1. Move that the Council amend the recommendation and award Contract #20220040 to Felix Associates of Florida, Inc.
2. Move that the Council not approve Contract #20220040 and provide staff with direction.
Background: The proposed Glades to Tradition Reuse Water Main project will consist of installing 12,000 LF of 24-inch reuse water main pipe to connect the existing reuse water main at Glades Cut Off Road on the southern end to an easement near the existing Glades Wastewater Booster Pump Station on Tradition Boulevard. The project will combine 9,200 LF of 24-inch C900 reuse pipe installed via open-cut and 3,000 LF of 24-inch HDPE reuse pipe installed via horizontal direction drilling including 600 LF of C900 force main pipe. The scope also includes all fittings, valves, appurtenances, and pipe associated with the installation of the C900 and HPDE sections.
The E-Bid was issued on March 10, 202...
Click here for full text